Conductor Jeremy handles the MU Connections while Bob does his inspection and hooks the gangway chains. |
Date:
4/6/2008 |
Location:
Butler, MO |
Views:
692 |
Collection Of:
Zach Pumphery |
Locomotives: |
Author: Zach Pumphery
|
|
Picture Categories: |
This picture is part of album: April 2008 in SEMO and Beyond |