Autograph.         
Late winter, early spring new crossing protection was installed here. Insulated rail joints were pre-built off site and then cut into the existing track, then welded.
Date: 8/22/2009 Location: Everett, OH Views: 106 Collection Of:   Fred Stuckmann
Author:  Fred Stuckmann
Autograph.
Picture Categories: Track This picture is part of album:  Cuyahoga Valley Scenic Railway Indigo Lake
Share
User Comments Contributor does not allow comments on their photos.
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=1721013