Crown Zellerbach's un-numbered 25-ton GE was built in March 1955 for the Tremont Lumber Co. |
Date:
10/10/1981 |
Location:
Joyce, LA |
Views:
677 |
Collection Of:
Michael Palmieri |
Locomotives: |
Author: Todd Minsk
|
|
Picture Categories: Roster |
This picture is part of album: Short Line and Industrial |