Copper Basin Railway  Contributor's Pick!       
CBRY Southbound Copper Ore Train OT-1 has just been loaded at Ray Mine & is bound for Hayden, Az. to be dumped, then will head back to Ray Mine for yet another load of Copper Ore. Trains are loaded & dumped within an hour more or less. I managed to catch 2 loads & 2 empties during daylight. The run between Hayden & Ray Mine is about 15 miles more or less, which is why they can make more than 1 round trip in daylight
Date: 4/7/2011 Location: Kelvin, AZ Views: 1055 Collection Of:   William H. Davis Jr.
Locomotives: CBRY 402(GP39) CBRY 401(GP39) CBRY 503(GP39)    Author:  william davis
Copper Basin Railway
Picture Categories: Scenic,Action This picture is part of album:  Copper Basin Railwa~
Share
User Comments
Name Type Comments Date
Terry Cantrell General Nice shot. 4/8/2011 1:08:47 PM
William H. Davis Jr. General Thanks Terry 4/8/2011 1:34:33 PM
Bradley Bates General Awesome shot! 4/9/2011 12:12:50 AM
William H. Davis Jr. General Thanks Bradley 4/9/2011 12:21:14 AM
Chris S General Absolutely beautiful shot! 4/9/2011 10:48:05 AM
William H. Davis Jr. General Thanks Chris 4/9/2011 11:03:49 AM
John Danielson General Stunning shot sir! 4/9/2011 6:00:00 PM
William H. Davis Jr. General Thanks John 4/9/2011 6:05:13 PM
Dennis Weber General Beautiful Shot & Great Album. 4/13/2011 9:14:10 PM
William H. Davis Jr. General Thanks Dennis, I had a great time photographing the Copper Basin Railway. 4/13/2011 9:17:22 PM

Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=2481375