After a pre-trip inspection they cut-away from the consist on the mainline and move down to the switch for the Tully AG Center. |
Date:
2/3/2013 |
Location:
Tully, NY Map  |
Views:
302 |
Collection Of:

Dave Curtis |
Locomotives: |
Author: Dave Curtis
|
.JPG) |
Picture Categories: |
This picture is part of album: ain CL-1 working in Tully, NY |