As P029 pulls through Point of Rocks, it prepares to drop its speed as a track authority commands it to slow its speed through East Brunswick because of the previous train in emergency. It would also have a delay at its station stop in Harpers Ferry as it would have to wait once again for Q217 and the car "stuck" at Shen. It was able to get out ahead of everything else though because of its high priority. |
Date:
6/19/2013 |
Location:
Point of Rocks, MD |
Views:
179 |
Collection Of:
Ryan Thomas |
Locomotives: |
Author: Ryan Thomas
|
|
Picture Categories: |
This picture is part of album: Restored Album |