Back in the day, the entire tunnel was 10 MPH, and took nearly 30-minutes to pass through. Now it is 20 and times through have been cut in half. Not good for railfans, since you used to be able to shoot at train in North Adams, then race here and get set-up before the train arrived. |
Date:
4/15/2004 |
Location:
Zoar, MA |
Views:
391 |
Collection Of:
Matt Adams |
Locomotives: |
Author: Matt Adams
|
|
Picture Categories: Roster,Scenic,Tunnel,Winter,Action |
This picture is part of album: Big G(uilford) Trip - April 12 to April 19, 2004 |