The new selected low floor high-speed train for the Swiss SBB, built by Stadler Rail. It will be operated on the North-South connection through the new 250 kph / 155 mph high-speed base tunnel of Gotthard beginning of 2019. Picture by Stadler Rail and Nose Design AG. |