The new 2nd track is getting a few final touches. Apparently 'new temporary' Tanglewood signal for the new track using an old B&O signal is in place awaiting activation. The new Tanglewood signals are across the bridge along with a set of cross overs. /DL |
Date:
10/24/2014 |
Location:
Bladensburg, MD |
Views:
83 |
Collection Of:
David Larrabee |
|
Author: David Larrabee
|
|
Picture Categories: Signal,Track |
This picture is part of album: Double Track on the Alexandria Extension |