An intermodal train to arrive at Erstfeld, were another BR 186 (BLS Re 486) will be put in front for the ride over the Gotthard summit line. As soon the basic tunnel will open for commercial operation in June 2016, this stop is not necessary anymore and the second engine no longer in need. |