A quick timeline: The 3 PNWR engines brought a train into the yard. The 2 UP locos arrived from the south while other train was still crossing the main. Then the UP engines entered the yard and connected to their cars. Next the PNWR locos connected to their cars. Then I got this shot. You can see crew members from each train standing on the ground in a rather full yard. |