Freight trains to Gotthard Base Tunnel / Switzerland  Contributor's Pick!       
A 2000 t / 4400 lbs sea container train from Rotterdam needs two Bo'Bo'Bo - Re 620 (locally called Re 12/12) to pass the Gotthard Base Tunnel at a required speed of 100 kmh / 125 mph.
Date: 4/21/2017 Location: Oberrueti ,  CH Country Flag Views: 217 Collection Of:   Peider SwissTrip
Locomotives: SBB 620(UNKNOWN)    Author:  Peider SwissTrip
Freight trains to Gotthard Base Tunnel / Switzerland
Picture Categories: This picture is part of album:  Restored Album
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=4690111