After lining the switch back, the transfer run conductor heads back to his train.  Contributor's Pick!       
There are 2 tracks up that way. Once the stone train heads out onto the CSX, the transfer run can come down and get permission out.
Date: 12/21/2017 Location: Akron, OH Views: 84 Collection Of:   Fred Stuckmann
Locomotives: WE 6988(SD40-2)    Author:  Fred Stuckmann
After lining the switch back, the transfer run conductor heads back to his train.
Picture Categories: Action This picture is part of album:  Winter, day one.
Share
User Comments Contributor does not allow comments on their photos.
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=4863016