WB action         
Work train in WB siding, WB freight holds the main at the "W" (wait) signal, and the pickup to be made waits in the EB siding. Brakeman on the ground (EB main) heads back to make the cut.
Date: 4/15/1985 Location: Truckee, CA Views: 297 Collection Of:   Bruce Flaws
Locomotives: SP 4417(SD9E)    Author:  Bruce Flaws
WB action
Picture Categories: Yard This picture is part of album:  SP Truckee area pics from the 1980s
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=4953005