MBTA 2019         
Viewed from the Hunnewell Street Bridge. Needham Heights is the last stop on the line; though the tracks continue on, they are abandoned past this point. Do not expect the line to reopen anytime soon, as the bridge over Interstate 95 was recently removed.
Date: 7/13/2017 Location: Needham Heights (sub, MA Views: 186 Collection Of:   Matthew Zisi
Author:  Matthew Zisi
MBTA 2019
Picture Categories: Roster,Bridge,Station,Passenger,Action This picture is part of album:  MBTA: Needham Heights, Sharon, Walpole, and Pawtucket
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=4995867