CN 2604 and CN 2412         
A CN unit train of empty centerbeam flatcars passes Neenah Foundry Plant 2 & Plant 3 as it crosses over from the former C&NW main line to the former SOO main line along Harrison St. at the south end of the yard at Neenah, WI on 22 Jun. '18. Plant 2 opened in 1960 and Plant 3 was built in 1967. Plant 1 opened in 1918 and stood about a mile to the north, until it was closed in 1994 and eventually demolished. Nightfall was setting in and I was attempting to use the nose of the leading locomotive to highlight the molten metal which could be seen flowing inside the foundry. Unfortunately, I opened the shutter a little earlier than I wanted to, so the lead locomotive is too far to the right. Also, the molten metal is not quite as noticeable within this scene as I had hoped it would be. C’est la vie!
Date: 6/22/2018 Location: Neenah, WI Views: 273 Collection Of:   T. P. Bruss
Locomotives: CN 2604(C44-9W) CN 2412(C40-8M)    Author:  T. P. Bruss
CN 2604 and CN 2412
Picture Categories: This picture is part of album:  Northeast WI, Summer 2018
Share
User Comments
Name Type Comments Date
Mike Maskel General GREAT SHOT 9/10/2018 10:01:53 AM

Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=5013249