new spur construction (part 3)         
The track for the new spur to the Florida Rock quarry is in place for the most part (it can seen heading toward the quarry at far left). The switch where the spur will join the mainline still awaits instalration, as do the gates on the new AL Highway 14 crossing. The light poles and guard rail along the road are also new.
Date: 10/28/2006 Location: Loachapoka, AL Views: 224 Collection Of:   John Higginson
Author:  John Higginson