2 days later I was hoping to catch the ERIE unit leading a westbound 25Z, but my deflector shield was in peak operating condition. Construction along the Cleveland Line played a part as well. |
Date:
5/19/2021 |
Location:
Hudson, OH |
Views:
56 |
Collection Of:
Fred Stuckmann |
Locomotives: |
Author: Fred Stuckmann
|
|
Picture Categories: Action |
This picture is part of album: NS OCS and a bonus eastbound. |