GCRY 29 missing its Boiler Jacketing
GCRY 2-8-0 Consolidation 29 is seen in the Process of having its Sheet Metal Around the Boiler being removed as it goes for its 1.572 day inspection at the GCRY Shops, The Engine plans to be running again in 2023