Second train unloaded and rain coming down, the crew loads what will be the third train of the day. Conductor Bill Moll protects the crossing as the train gets ready to reposition for more loading. |
Date:
5/17/2022 |
Location:
Piercefield, NY |
Views:
68 |
Collection Of:
Matt Giardino |
Rolling Stock: |
Author: Matt Giardino
|
|
Picture Categories: |
This picture is part of album: Adirondack Railroad Ballast Trains 2022 |