CP Basta         
View from Metrolink F59PH 873 on the head end of train 602 - We prepare to take the switch from Main Track 2 to Main Track 3 which will position us for our platform work at Fullerton - BNSF San Bernardino Subdivision.
Date: 1/23/2007 Location: Fullerton, CA Views: 120 Collection Of:   Christopher Palmieri
Author:  Christopher Palmieri
CP Basta
Picture Categories: InCab,Passenger,Track,Action This picture is part of album:  Ride Metrolink 602 - II - 1-23-2007 - CMP
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=670257